for fire-protection engineers

The agent that drafts
your sprinkler design.
You sign it off.

Shibi reads your DWG, picks the right standards, places the heads, runs the hydraulic, and hands you a revision with every decision cited and every change inspectable. You stay the engineer of record.

12firmspre-launch beta cohort
EN 12845 + NFPA 13standardsencoded at the clause level
10×your pipelinemore designs · same headcount
Floor1.dwg · r-04shibi · live
shibi

Added 6 in-rack heads on zone B. Margin holds at +13.8%.

NFPA 13 §16.4ASCE 7-22
HOW IT WORKS

Three surfaces. One agent. Your judgement.

shibi

Group 2 storage with steel rack to 18′. Per NFPA 13 §16.4 you'll need in-rack at the 8′ mid-shelf. Confirm K-factor — owner spec says 14.0?

NFPA 13 §16.4
01

Conversation

Tell Shibi the scope, the hazard class, the owner constraints. It asks back. Every step shows the standards it's leaning on.

02

Drawing

Shibi opens your DWG in a viewport you both share. Heads, branches, braces — placed inline, with diff overlays you can accept head-by-head.

authorshibi09:14
designerB. Vakfi09:21
PE of recordawaits you
sha256:9f3b2c…7e1a
03

Sign-off

Every revision arrives stamped: tools used, sources cited, hash recorded. You approve, the audit log is complete. AHJ-ready.

TRUST · BUILT IN

Every change is traceable. Every citation is real.

ATTRIBUTED

No anonymous edits.

Each entity in the drawing carries its provenance — who proposed it, who approved it, which standard required it.

CITED

Standards, not vibes.

Shibi cites NFPA, ASCE, IBC, and FM at the clause level. If a citation can't be produced, the change isn't proposed.

REVERSIBLE

Revisions, not commits.

Every action is a numbered revision. Roll back to r-02 in one click. Compare across revisions. Nothing is destroyed.

LICENSED

You stamp it.

Shibi never closes a review. The PE of record signs every revision with a cryptographic hash bound to their license.

STANDARDS · LIVE

Always current. Always cited.

TS EN 128452024
Sprinkler systems · EUsync · live
NFPA 132025
Sprinkler systems · USsync · live
NFPA 142024
Standpipe & hose
NFPA 202025
Stationary pumps
NFPA 252023
Inspection · ITM
ASCE 72022
Minimum design loads
IBC2024
Building code
IFC2024
Fire code
FM 2-02024
Property loss prevention
EU · CPR2024
Construction Products Reg.in-progress
California · T242022
CA Building / Fire Codein-progress
New York · NYC FC2022
NYC Fire Codein-progress
OUR TARGETS

What we're building toward.

5–10×target · design throughput per designer
80–90%target · reduction in design hours per project
<2 daystarget · design → PE sign-off cycle
12 firmslive · onboarding for pre-launch beta

Bring Shibi to your firm. Stay the engineer of record.

Pilots open monthly for FP firms with active PE supervision. We onboard your standards library, your CAD conventions, and your review process — not the other way around.